Monday, July 23, 2012

Progress report

Today, the plumbers completed the basic installation and turned on the water to the house. The electricians are closer to finishing the electrical system. Finally, the PV (photovoltaic = solar) crew installed the aluminum frames which will house the solar panels.


The final sewer connection is finished


The aluminum frames on the south roof surface


The last connection to bring water into the house


The basement shower enclosure

No comments:

Post a Comment