Tuesday, September 18, 2012

Driveway and trim today

Every day we get closer to finishing the house and moving in. Today the concrete guys poured the driveway, sidewalk, and the pad outside the basement door. The trim crew continued to install window and door trim.


The newly poured concrete for the driveway


The newly poured walkway


The newly poured pad outside the basement door

The door trim looking toward the master bedroom

Door trim looking toward the master closet


The completed drive and sidewalk


Finishing the sidewalk