Progress on the wood floor

The wood floor guys have made great progress today, and may finish today. The insulation crew finished their job today, which will keep the hot air outside.


The completed floor in the guest bedroom


Working on the master bedroom


Tile completed in the basement


The top view of the deck


Working on the hallway floor


Working on the great room floor

Wednesday, August 29, 2012

We have a cool house!

The air conditioning is up and working (in fact its downright chilly in the basement). Arctic Insulation was blowing insulation into the attic and over the garage so the cool will stay inside. The wood floor guys have finished Rita's sewing room, and are working in the guest bedroom. The guys also finished the basic construction of the deck.



The finished floor in the sewing room


Paper and wood in the guest bedroom


Arctic Insulation blowing insulation in the attic and garage


The basic structure of the deck is finished

Tuesday, August 28, 2012

We have AC!!

The geothermal guys completed the installation of the piping connected to the ground loops and the heating/cooling system. The materials for the deck were delivered today.


The pipes connecting the ground loops to the heat pump


The geothermal guys completing the installation


The deck materials delivered

Monday, August 27, 2012

Tile and flooring progress

As of today we have electricity in the house. Alliant finally installed the new meter one that will work with our solar system. The meter will run backward when we are producing more electricity than we use. The floor tile crew worked Saturday and Sunday to complete about 90% of the tiling job. The hardwood flooring was delivered today, with installation later this week.


The stacks of hardwood awaiting installation



The floor in the entryway


The floor in the laundry room


The floor in the master bath


The basement floor nearing completion

Tuesday, August 21, 2012

Painting and stone completed

The painters finished painting the ceiling, and painted the garage so our garage door can be installed. The stonemasons completed the stone on the west wall. When the gutters are installed, and the new exterior doors to replace the temporary ones now in place, the exterior of our new house will be finished.


Gravel to be spread under the new deck


Stonemasons beginning work on the front porch area



Painting completed in the garage


Ceiling painting completed (the walls will receive a second coat after the crown mouldings are installed)


The completed stonework on the west side

Friday, August 17, 2012

Ready for interior paint

Yesterday the painters finished the orangepeel finish on the ceilings and walls. Next week should see the completion of the interior paint and the deck. The retaining walls will be constructed soon.




Siding completed-west side




Porch area ready for stone


Siding finished-north side


Orangepeel-great room



Orangepeel-basement

Friday, August 10, 2012

Sheetrock completed, progress on siding

Today the sheetrock crew finished their job by taping and mudding the walls and ceilings in the house and garage. A final sanding and the walls will be ready for paint. The siding crew finished the north wall of the garage, and most of the east end of the house.


The finished west side (bare space wii be filled with stone)


Completed north end of the garage


The finished walls of the garage


The finished basement walls