The completed floor in the guest bedroom |
Working on the master bedroom |
Tile completed in the basement |
The top view of the deck |
Working on the hallway floor |
Working on the great room floor |
The completed floor in the guest bedroom |
Working on the master bedroom |
Tile completed in the basement |
The top view of the deck |
Working on the hallway floor |
Working on the great room floor |
The finished floor in the sewing room |
Paper and wood in the guest bedroom |
Arctic Insulation blowing insulation in the attic and garage |
The basic structure of the deck is finished |
The pipes connecting the ground loops to the heat pump |
The geothermal guys completing the installation |
The deck materials delivered |
The stacks of hardwood awaiting installation |
The floor in the entryway |
The floor in the laundry room |
The floor in the master bath |
The basement floor nearing completion |
Gravel to be spread under the new deck |
Stonemasons beginning work on the front porch area |
| Painting completed in the garage |
Ceiling painting completed (the walls will receive a second coat after the crown mouldings are installed) |
The completed stonework on the west side |
Siding completed-west side |
Porch area ready for stone |
Siding finished-north side |
Orangepeel-great room |
Orangepeel-basement |
The finished west side (bare space wii be filled with stone) |
Completed north end of the garage |
The finished walls of the garage |
The finished basement walls |