The geothermal guys completed the installation of the piping connected to the ground loops and the heating/cooling system. The materials for the deck were delivered today.
 |
The pipes connecting the ground loops to the heat pump |
 |
The geothermal guys completing the installation |
 |
The deck materials delivered |
No comments:
Post a Comment