Tuesday, August 7, 2012

Progress update

Rita and I have been on vacation in Missouri with Matthew, Melissa, and our two oldest grandsons for the past week, so I will update progress on our house. While we were gone the electrical and plumbing systems were completed, and the the PV (solar) system was completed. As soon as we get our internet connection is made we can start producing electricity. The wall cavities between the studs were sprayed with one inch of closed cell foam. Today, Arctic Insulation placed fiberglass batts between the studs and covered it with a thick plastic vapor barrier. The sheetrock crew delivered a large amount today, and the sheetrock will be installed tomorrow. Friday, the siding that was delivered Monday will be installed.


The third post on the front porch


The insulation batts in place
 

Completed vapor barrier and sheetrock - basement



Great room - sheetrock and boxes of mud