Thursday, June 21, 2012

Exterior structure is complete

In less than three weeks of construction (not counting weekends) the outside of the house is complete with the installation today of the waterproof layer on all roof surfaces. The remaining tasks on the exterior are the installation of doors, windows, siding, the metal roof, and the installation of the solar electric system. Additionally, the concrete floor in the garage, the front porch, the sidewalks, and the driveway need to be completed. Then, focus will turn to completing the interior of the house.


A view of the garage from what will be the driveway


Leonard staring into the sun from the front porch