This morning saw several truckloads of sand being blown inside the foundation walls to provide a base for the concrete floor in the basement and garage. This afternoon the plumbers began to construct the pipes and drains that will go under the basement floor.
 |
Blue-board insulation being placed inside the walls as sand is blown in |
 |
Plumbers working while sand is blown inside the foundation |
 |
The plumbers assembling the drains |
No comments:
Post a Comment